Evose

Manufacturing

From shift handover to a signed 8D

Drafts handovers, 8D reports and change impact lists

Contact sales
Example

Agents follow up on issues across shifts and teams

  • Parts that fail the first pass
  • Lines stopped by downtime or shortages
  • Defects that reach the customer
  1. 01

    Planning

    Turn customer orders into a build plan and material needs

    Rush orders and shortages keep rewriting the plan and the promise dates

    Agents takeChases shortages and answers internal date checks

    Owner · Supply chain

  2. 02

    Inbound materials

    Suppliers ship by lot, and each lot is sampled before it goes to stock

    Supplier corrective actions are chased one email at a time

    Agents takeDrafts the request and works out the shortage impact

    Owner · Supply chain

  3. 03

    Production

    Run three shifts and log downtime, changeovers and rejects

    Issues are handed over by word of mouth and lost between shifts

    Agents takeSummarizes the shift and drafts the handover

    Owner · Production and engineering

  4. 04

    Engineering change

    Release drawing, tooling and material changes to the line

    Work instructions and inspection plans get missed

    Agents takeLists every affected document and old-revision part

    Owner · Production and engineering

  5. 05

    Release

    Decide from inspection records whether finished goods can ship

    Release evidence is spread across several records

    Owner · Quality

  6. 06

    Customer complaints

    Answer customer complaints with containment and an 8D

    Tracing lots and in-transit stock means searching several systems

    Agents takeDrafts D1 to D4 and the containment list

    Owner · Quality

Three teams, one organization context

Loading team responsibilities
Read and write backSystems and knowledgeGoals and human decisions

These teams and flows are illustrative, not a specific customer.

Work agents take on

Request

@Shift handover assistant Line 2 morning shift is wrapping up. Pull downtime, rejects and open work orders into the handover, say exactly where the M-07 stop is stuck and put what afternoon needs to watch at the top

  • Lark · Line 2 crew
  • MES downtime and rejects (HTTP plugin, read-only)
  • Maintenance requests (HTTP plugin, read-only)
  • Production · Handover template
  • Open handover items

Run

  1. Pull this shift's downtime, rejects and changeovers and check output
  2. Find open work orders and quality holds, and who each one is waiting on
  3. Write the handover card with what afternoon must watch at the top
  4. Review the handover, take the shift and claim each open itemAfternoon shift lead Mike Torres
  5. Log claims in the table so the next handover carries open items forward

Every step is in the run trace

Where people decide

Agents prepare the work. Key decisions stay with people.

  • The quality manager decides release, scrap and deviations

  • Example

    Maintenance confirms restarts and anything safety-related on the floor

  • Reports to customers and suppliers go out only after the owner signs

Start with one pilot

Try one workflow first, measure it, then roll it out.

Customer 8D drafts

Slow complaint responses hurt supplier scorecards, and past 8Ds make a ready test set

Before you start

  • A year of closed 8Ds with the original complaints
  • An export path for MES lot traceability and ERP stock
  • One quality engineer to review every draft

Measure first

  • Time from complaint to completed D3 containment
  • Drafts sent back in internal review
  • Share of 8Ds where the customer asks for D4 to be redone

When to stop

  • Stop at once if containment misses a lot or stock location, and trace by hand

Plan your rollout with us

Tell us about your teams and where Evose should run.

Contact sales